BNSF is committed to the safe operation of every mile of our 32,500-route-mile network. That network includes more than 300 miles of track across more than 13,000 bridges, which must be kept safe, secure and structurally sound. BNSF’s Bridge Management Program includes comprehensive inspections and an ongoing commitment to maintaining and repairing and, when necessary, replacing, rail bridges on the BNSF network.

A Track Record of Safety

  • 99.9995% of bridge train miles occur without any type of service interruption.*
  • 0.015% of service interruptions across our entire network are caused by a bridge being removed from service.*
  • No derailments have been caused by the structural integrity of a bridge.

* Jan. 1, 2014 – Jan. 1, 2017

Federal Regulations

  • The Federal Railroad Administration (FRA) requires railroads to have a Bridge Management Program to ensure the safety of railroad bridges.
  • Programs must include a provision for inspecting every bridge in service annually, with no more than 540 days between inspections.
  • The FRA audits the Bridge Management Programs and inspections records through document review and field verification.

Regular Comprehensive Inspections

  • Comprehensive Inspections are thorough, visual, documented inspections encompassing the entire bridge structure.
  • Bridges on BNSF's core routes are typically inspected two times per year, exceeding FRA standards.
  • BNSF's expert, certified Railroad Bridge Inspectors performed more than 61,000 Comprehensive Inspections in 2016.

Commitment to Maintenance, Repair & Replacement

  • In the rare instance a structural defect is identified, the bridge is removed from service until repaired or until a Special Inspection resolves the issue.
  • Since 2014, BNSF has devoted more than $478 million on bridge maintenance and repair, repairing or replacing more than 480 bridge components and completely replacing more than 290 bridges.
  • Since 2007, BNSF has devoted more than $1 billion to rail bridge capital investments.

Supplemental Inspection Technology

  • BNSF owns six and leases three Bridge Inspection Vehicles (BIVs) that are specially equipped to allow safe access to inspect the entire bridge structure; BIVs conduct more than 900 inspections per year.
  • When a portion of the bridge foundation is underwater, BNSF deploys a team of divers to inspect.
  • BNSF also conducts supplemental bridge inspections using Unmanned Aerial Vehicles (UAVs).